| NYC Department of Buildings | ||
| After Hours Variance Permit Data | ||
| Premises: 32 RIVERSIDE BOULEVARD MANHATTAN | Job No: 121181363 | |||
| BIN: 1089742 Block: 1171 Lot: 7509 | Reference Number: 00580220 | |||
| 1 Filing Status Information | |||||||||
| Work Permit No: | 121181363 | e-Renewed based on: | 00521476 | Status: | AHV SUCCESSFULLY ISSUED | ||||
| eFiled: | Yes | Entry Date: | 04/13/2015 | ||||||
| Job Type: | NB | Filing Type: | Renewal | ||||||
| Fee Exempt: | No | Number of Days Billed : | 4 | Total Fee: | $580.00 | ||||
| 2 Location Information (Filed At) | |||||||||
| House No(s): | 50 | Street Name: | RIVERSIDE BOULEVARD | ||||||
| Borough: | MANHATTAN | Block: | 1171 | Lot: | 7509 | BIN: | 1089742 | CB No: | |
| Work on Floor(s): | GROUND | Apt/Condo No(s): | |||||||
| 3 Contractor | |||||||||
| Name: | FRANK DEGENNARO | ||||||||
| Business Name: | TISHMAN CONSTRUCTION CORP | Business Phone: | 212-399-6800 | ||||||
| Business Address: | 100 PARK AVENUE NEW YORK NY 10017 | ||||||||
| E-Mail: | |||||||||
| License Type: | GC | License Number: | 002540 | ||||||
| 5 Variance Information | ||||||
| Is a residence within 200 feet of the site? |
|
|
||||
| Is all work being done within an enclosed building? |
|
|
||||
| Does any of the work involve full or partial demolition? |
|
|
||||
| Does any of the work involve crane use? |
|
|
||||
| Total Days Requested: 4 | ||||||
| Total Days Approved: 4 | ||||||
| Approved for: | ||||||
| Start Day: | Days: | Hours From: | Hours To: | |||
| 04/18/2015 | Saturday | 7:00 AM | 5:00 PM | |||
| 04/19/2015 | Sunday | 7:00 AM | 5:00 PM | |||
| 04/25/2015 | Saturday | 7:00 AM | 5:00 PM | |||
| 04/26/2015 | Sunday | 7:00 AM | 5:00 PM | |||
| eRenew? No | ||||||
| Apply Reason: PUBLIC SAFETY | ||||||
| Approved: TRAFFIC CONGESTION (PEDESTRIAN AND/OR VEHICULAR) | ||||||
| Description of Work: | EXCAVATION, DEBRIS REMOVAL, MATERIAL DELIVERY AS NEEDED, TRUCKING AS NEEDED, CARPENTRY, HOUSEKEEPING, PAVING, REINFORCING INSTALLATION, CONCRETE FORMWORK, CONCRETE PLACEMENT, WELDING, PLUMBING WORK, ELECTRIC WORK, SCAFFOLD ERECTION, MECHANICAL HVAC WORK, USE AND OPERATION OF CRAWLER CRANE. INSTALLING HOIST CARS. HOIST JUMP, OPERATION OF HOIST, USE OF TOWER, CRAWLER, HYDRAULIC CRANE, INSTALLATION OF PRECAST, CURTAINWALL INSTALLATION. <<SAT/SUN: 7AM-5PM RESIDENTIAL AREA PER DBC>> | |||||