| 5 Variance Information |
| Is a residence within 200 feet of the site? |
Yes
|
No
|
|
| Is all work being done within an enclosed building? |
Yes
|
No
|
|
| Does any of the work involve full or partial demolition? |
Yes
|
No
|
|
| Does any of the work involve crane use? |
Yes
|
No
|
|
| Total Days Requested: 1 |
| Total Days Approved: 1 |
|
|
| Start Day: |
Days: |
Hours From: |
Hours To: |
|
| 07/28/2012 |
Saturday |
8:00 AM |
6:00 PM |
| eRenew?
Yes |
|
| Apply Reason: PUBLIC SAFETY |
|
Approved:
OTHER |
| eRenewal Authorized Day(s)/Time(s):
Saturday 8:00 AM to 6:00 PM |
| Description of Work: |
MATERIAL DELIVERY, UNLOADING CONSTRUCTION MATERIAL AT THE SITE, NON-STRUCTURAL DEMOLITION, CARPENTER INSTALLING CF FRAMING SYSTEM, INSTALL GYPSUM BOARD & WOOD BLOCKING. HVAC INSTALLATION OF METAL DUCTWORK, REFRIGERANT PIPING. FLOORING VENDOR TO PREPARE CONCRETE FLOORS AND ELECTRICIAN TO INSTALL ROUGH-IN CABLING, BACK BOXES. MILL WORKER TO INSTALL ARCHITECTURAL WOOD WORK. FLOORING VENDOR TO PREPARE AND INSTALL FINISH FLOORING. |