![]() |
|
|
| NYC Department of Buildings | ||
| After Hours Variance Permit Data | ||
| Premises: 12 HENRY STREET BROOKLYN | Job No: 310088972 | |||
| BIN: 3001543 Block: 211 Lot: 22 | Reference Number: 00449835 | |||
| 1 Filing Status Information | |||||||||
| Work Permit No: | 310088972 | Status: | APPROVED -- FINAL FEE DUE | ||||||
| eFiled: | Entry Date: | 07/18/2012 | |||||||
| Job Type: | A1 | Filing Type: | Initial | Decision Date: | 07/18/2012 | ||||
| Fee Exempt: | No | Number of Days Billed : | 1 | Total Fee: | $210.00 | ||||
| 2 Location Information (Filed At) | |||||||||
| House No(s): | 73 | Street Name: | MIDDAGH STREET | ||||||
| Borough: | BROOKLYN | Block: | 211 | Lot: | 22 | BIN: | 3001543 | CB No: | 302 |
| Work on Floor(s): | CEL, MZ7, 001 THRU 007 | Apt/Condo No(s): | |||||||
| 3 Contractor | |||||||||
| Name: | RICHARD SANTOSKY | ||||||||
| Business Name: | HUDSON MERIDIAN CONSTRUCT | Business Phone: | 212-608-6600 | ||||||
| Business Address: | 40 RECTOR STREET.18TH FLOOR NEW YORK NY 10006 | ||||||||
| E-Mail: | |||||||||
| License Type: | GC | License Number: | 029921 | ||||||
| 5 Variance Information | ||||||
| Is a residence within 200 feet of the site? |
|
|
||||
| Is all work being done within an enclosed building? |
|
|
||||
| Does any of the work involve full or partial demolition? |
|
|
||||
| Does any of the work involve crane use? |
|
|
||||
| Total Days Requested: 1 | ||||||
| Total Days Approved: 1 | ||||||
| Start Day: | Days: | Hours From: | Hours To: | |||
| 07/21/2012 | Saturday | 10:00 AM | 4:00 PM | |||
| eRenew? Yes | ||||||
| Apply Reason: PUBLIC SAFETY | ||||||
| Approved: TRAFFIC CONGESTION (PEDESTRIAN AND/OR VEHICULAR) | ||||||
| eRenewal Authorized Day(s)/Time(s): Saturday 10:00 AM to 4:00 PM | ||||||
| Description of Work: | EXTERIOR FACADE STUCCO AND BRICK, 7TH FLOOR BRICK WALL REBUILD, WALL FRAMING/ DRY/WALL FLOORS 1-5, STEEL C-CHANNEL, INSTALL 3-5, CMU BLOCK WORK AT ROOF BULKHEAD, STRUCTURAL STEEL ERECTION AT 7TH FLOOR MEZZ AN ROOF MEMBERS. CONCRETE POUR AND ROOFING. WALL FRAMING AT 7TH FL MEZZ AND ROO, ELECTRICAL, HVAC, SPRINKLER, AND PLUMBING, ROUGH IN FLOORS 1-5. CONCRETE POUR SLAB ON GRADE AND ADD FRAMING, DRYWALL, ELECTRICAL, HVAC, SPRINKLER, PLUMBING, TAPING, INSTALL WOOD FLOORING FLOORS 1-7 MEZZ. | |||||