![]() |
|
|
| NYC Department of Buildings | ||
| Overview for Complaint #:4645696 = RESOLVED | ||
| Complaint at: 109-23 112 STREET | BIN: 4249205 | Borough: QUEENS | ZIP: 11420 | |||
| Re: I HAVE A SHARED DRIVEWAY WITH MY NEIGHBOR. THE NEIGHBOR RAISED THE LEVEL OF THEIR HALF OF THE DRIVEWAY LAST SUMMER. AS A RESULT, RAIN WATER AND MELTING SNOW SLOPES ONTO MY SIDE, DAMAGING MY DRIVEWAY. | ||||||
| Category Code: | 06 CONSTRUCTION - CHANGE GRADE / CHANGE WATERCOURSE | |
| CONSTRUCTION UNDERWAY : WATER FLOWING ON PROPERTY - GRADE/WATERCOURSE CHANGED | ||
| Assigned To: | SPECIAL OPERATIONS | Priority: B |
| 311 Reference Number: 1-1-1220213921 | ||
| Received: | 03/02/2016 | Block: 11593 | Lot: 54 | Community Board: 410 | ||
| Owner: | RUSSELL MAHARAJ | |||||
| Last Inspection: | 09/03/2016 - - BY BADGE # 2647 |
| Disposition: | 10/12/2016 - A8 - ECB VIOLATION SERVED |
| DOB Violation #: | 090316ZSPOUA02 |
| ECB Violation #: | 35207502X |
| Comments: | PLANTING AREA NEWLY BEEN REPLACED WITH CONCRETE PAD 32.33 FRONTAGE SHOULD HAVE 25% PLANTATION 100% CONCRETE OBSRVED |
| Complaint Disposition History |
| # | Disposition | Disposition | Inspection | Date | |
| Date | Code | By | |||
| 2 | 10/12/2016 | A8 | ECB VIOLATION SERVED | 2647 | 09/03/2016 |
| PLANTING AREA NEWLY BEEN REPLACED WITH CONCRETE PAD 32.33 FRONTAGE SHOULD HAVE 25% PLANTATION 100% CONCRETE OBSRVED | |||||
| 1 | 08/12/2016 | E6 | COMPLAINT ASSIGNED TO SPECIAL OPERATIONS UNIT | 2374 | 08/12/2016 |
| REFER TO SPECIAL OPS | |||||