![]() |
|
|
| NYC Department of Buildings | ||
| Overview for Complaint #:3252395 = RESOLVED | ||
| Complaint at: | 182A 26 STREET | BIN: 3009652 | Borough: BROOKLYN | ZIP: 11232 | |||
| Re: | FAILURE TO SAFE GUARD SITE | ||||||
| Category Code: | 73 FAILURE TO MAINTAIN | |
| DOB District: | N/A | |
| Special District: | ||
| Assigned To: | BROOKLYN BOROUGH OFFICE | Priority: C |
| Received: | 02/01/2008 09:08 | Block: 657 | Lot: 36 | Community Board: 307 | ||
| Owner: | X X ..X | |||||
| Last Inspection: | 02/14/2008 - - BY BADGE # 2161 |
| Disposition: | 02/20/2008 - - L2 - STOP WORK ORDER FULLY RESCINDED |
| Job Number: | |
| Comments: | SITE SAFE FENCE INSTALLED |
| Complaint Disposition History |
| Disposition | Disposition | Inspection | Date | |
| Date | Code | By | ||
| 02/01/2008 | A3 | FULL STOP WORK ORDER SERVED | 1734 | 01/31/2008 |
| PERIMETER FENCING NOT SOLID THRUOUT,NO NOTIFICATION OF DOB F | ||||
| 02/01/2008 | L1 | PARTIAL STOP WORK ORDER | 1734 | 01/31/2008 |
| TEMP PARTIAL LIFT TO INSTALL/COMPLETE A SOLID FENCE THRUOUT POUR SIDEWALK SLABS AT FRONT ONLY TO ENLARGE SIDEWALK PATH | ||||
| 02/20/2008 | L2 | STOP WORK ORDER FULLY RESCINDED | 2161 | 02/14/2008 |
| SITE SAFE FENCE INSTALLED | ||||