|
||
NYC Department of Buildings | ||
Overview for Complaint #:1571559 = RESOLVED |
Complaint at: 33 BANK STREET | BIN: 1011031 | Borough: MANHATTAN | ZIP: 10014 | |||
Re: SIX FLOOR APARTMENT BUILDING. RE-POINTING OF THE FACADE ONTHE INTERIOR COURTYARD. PILES OF CONSTRUCTION DEBRIS, MOSTLY BRICKS. |
Category Code: | 09 DEBRIS - EXCESSIVE | |
DEBRIS : EXCESSIVE | ||
Assigned To: | MANHATTAN CONSTRUCTION ENFORCEMENT | Priority: B |
311 Reference Number: 311-06299985 |
Received: | 05/18/2021 | Block: 615 | Lot: 52 | Community Board: 102 | ||
Owner: | LUSTRO REALTY , LLC |
Last Inspection: | 06/22/2021 - - BY BADGE # 3231 |
Disposition: | 06/23/2021 - L2 - STOP WORK ORDER FULLY RESCINDED |
Comments: | AT TIME OF INSPECTION PREVIOUS COMPLAINT UNDER PERMIT #140990747 FOR EXCESSIVE DEBRIS IN REAR YARD AND THROUGH OUT BUILDING. AT TIME OF INSPECTION GAINED ACCESS INTO BUILDING AND REAR YARD OBSERVED NO DEBRIS BLOCKING EGRESS IN REAR YARD OR THROUGH OUT BUILDING. OK TO LIFT SWO |
Prev DOB Violation #: | 052421C02DA01 |
Prev ECB Violation #: | 39041562X |
Complaint Disposition History |
# | Disposition | Disposition | Inspection | Date | |
Date | Code | By | |||
2 | 06/23/2021 | L2 | STOP WORK ORDER FULLY RESCINDED | 3231 | 06/22/2021 |
AT TIME OF INSPECTION PREVIOUS COMPLAINT UNDER PERMIT #140990747 FOR EXCESSIVE DEBRIS IN REAR YARD AND THROUGH OUT BUILDING. AT TIME OF INSPECTION GAINED ACCESS INTO BUILDING AND REAR YARD OBSERVED NO DEBRIS BLOCKING EGRESS IN REAR YARD OR THROUGH OUT BUILDING. OK TO LIFT SWO | |||||
1 | 05/24/2021 | L1 | PARTIAL STOP WORK ORDER | 2923 | 05/24/2021 |
GAINED ACCESS TO REAR OF BUILDING AND APTS 24 AND 29. UPON INSPECTION OBSERVED EXCESSIVE DEBRIS IN THE REAR OF BUILDING AS WELL AS DUST AND DEBRIS ALONG REAR WINDOWS OF AND INSIDE APTS 24 AND 29. ISSUING PARTIAL STOP WORK ORDER FOR FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING. (ONLY WORK PERMITTED IS TO CLEAN EXCESSIVE DUST AND DEBRIS IN REAR AND THROUGHOUT BUILDING) |