| | | | | | | | | |
FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
08/18/2022 |
140929020 |
03 |
A1 |
P APPROVED |
08/23/2022 |
|
ROTHSTEI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS
|
09/14/2021 |
140929020 |
02 |
A1 |
P APPROVED |
10/14/2021 |
|
ROTHSTEI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS
|
07/22/2020 |
140929020 |
01 |
A1 |
X SIGNED OFF |
08/23/2022 |
0026466 RA |
ROTHSTEI |
|
NOT APPLICABLE
|
|
REMODEL APT BF ON BASEMENT LEVEL, CREATE ACCESSORY SPACE AT CELLAR LEVEL
|
|
Work on Floor(s): CEL,BAS
|
02/25/2019 |
122485159 |
04 |
A1 |
P APPROVED |
03/08/2019 |
|
ROTHSTEI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,ROF
|
12/11/2018 |
140325315 |
03 |
A2 |
P APPROVED |
02/28/2019 |
|
ROTHSTEI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 REMODEL APT 4A ON THE 4TH FLOOR. NO CHANGE
|
|
Work on Floor(s): 004
|
06/08/2018 |
140367797 |
02 |
A2 |
P APPROVED |
06/11/2018 |
|
ROTHSTEI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS
|
06/19/2017 |
140611611 |
02 |
A2 |
P APPROVED |
06/20/2017 |
|
ROTHSTEI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 003
|
03/01/2017 |
140611611 |
01 |
A2 |
X SIGNED OFF |
03/21/2019 |
0026466 RA |
ROTHSTEI |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF APT 3B ON THE THIRD FLOOR. NO CHANGE TO USE, EGRESS
|
|
Work on Floor(s): 003
|
07/21/2016 |
122485159 |
03 |
A1 |
P APPROVED |
07/28/2016 |
|
ROTHSTEI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,ROF
|
06/15/2016 |
140317379 |
02 |
A2 |
P APPROVED |
06/28/2016 |
|
ROTHSTEI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 REPLACE STAIRS AND HAND RAIL FROM CELLAR TH
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
04/11/2016 |
140325315 |
02 |
A2 |
P APPROVED |
04/19/2016 |
|
ROTHSTEI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 004,ROF
|
08/18/2015 |
122485159 |
02 |
A1 |
P APPROVED |
08/25/2015 |
|
ROTHSTEI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 CREATE ACCESSORY SPACE AT CELLAR LEVEL CONN
|
|
Work on Floor(s): CEL,BAS,ROF
|
07/30/2015 |
122485159 |
01 |
A1 |
X SIGNED OFF |
03/29/2019 |
0026466 RA |
ROTHSTEI |
|
NOT APPLICABLE
|
|
CREATE ACCESSORY SPACE AT CELLAR LEVEL CONNECTED TO APARTMENT ABOVE AND AD
|
|
Work on Floor(s): CEL,BAS,ROF
|
06/26/2015 |
140367797 |
01 |
A2 |
X SIGNED OFF |
03/19/2019 |
0026466 RA |
ROTHSTEI |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF APT BR IN BASEMENT. NO CHANGE TO USE, EGRESS OR
|
|
Work on Floor(s): BAS
|
05/28/2015 |
122416439 |
01 |
A1 |
J P/E DISAPPROVED |
08/05/2015 |
0026466 RA |
ROTHSTEI |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 08/12/2015 CREATE ACCESSORY SPACE AT CELLAR LEVEL CONNECTED
|
|
Work on Floor(s): CEL,BAS
|
03/24/2015 |
140325315 |
01 |
A2 |
X SIGNED OFF |
03/07/2019 |
0026466 RA |
ROTHSTEI |
|
NOT APPLICABLE
|
|
REMODEL APT 4A ON THE 4TH FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
|
|
Work on Floor(s): 004
|
03/05/2015 |
140317379 |
01 |
A2 |
X SIGNED OFF |
03/18/2019 |
0026466 RA |
ROTHSTEI |
|
NOT APPLICABLE
|
|
REPLACE STAIRS AND HAND RAIL FROM CELLAR THRU ROOF. ALL SPRINKLER WORK IS
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
02/11/2015 |
140310795 |
01 |
A2 |
D A/P ENTIRE |
02/11/2015 |
0026466 RA |
ROTHSTEI |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/04/2015 REPLACE STAIRS AND HAND RAIL FROM CELLAR THRU FOU
|
|
Work on Floor(s): CEL,1-4,ROF
|
04/27/2009 |
120020850 |
01 |
A1 |
X SIGNED OFF |
09/24/2009 |
0014108 RA |
LACHNER |
|
NOT APPLICABLE
|
|
OBTAIN AMENDED C OF O TO CORRECT DOB CLERICAL ERROR ON EXISTING C OF O.
|
|
Work on Floor(s): CEL,BAS,001,002,003,004
|
06/18/1999 |
102219421 |
01 |
A2 |
X SIGNED OFF |
05/05/2000 |
0014108 RA |
LACHNER |
|
NOT APPLICABLE
|
|
RENOVATE EXISTING KITCHEN AND BATHROOM IN APARTMENT 1A
|
|
Work on Floor(s): 1
|