List of Required Items
Premises: 35 UNDERHILL AVENUE BROOKLYN Job No: 301468784
BIN: 3850870    Block: 1131    Lot: 6 Job Type: NB - NEW BUILDING
83 TOTAL ITEMS REQUIRED FOR JOB
WHO
RECV+
PRI
TO
REQUIRED
DATE
RECEIVED
DATE
DATE
CERTIFIED
W
V
* PC FILED APP/OWNER SIGNED AND SEALED T APP 01/21/2003 02/03/2003
BPP: FILING REQUIRED T APP 01/21/2003 02/03/2003
* ASBESTOS ASB 4 T APP 02/03/2003 02/03/2003
ADDRESS: NEW HOUSE NUMBER APPROVED T APP 02/03/2003 02/03/2003
TAX LOT: TENTATIVE LOT NUMBER ISSUED T APP 02/03/2003 02/03/2003
STREET: NEW STREET NAME APPROVED T APP 02/03/2003 02/03/2003
SITE CONNECTION: DEP T APP 02/03/2003 02/03/2003
SITE SURVEY: INITIAL N APP 02/03/2003 02/04/2003
FOUNDATION PLAN APPROVAL N APP 02/03/2003 02/03/2003
* DOF RP604 FORM REQUIRED (P/E SIGNED & APPROVED) T APP 02/03/2003 02/03/2003
* * BORINGS / TEST PITS (TR-4) 27-720 N APP 02/03/2003 02/03/2003 11/09/2006
* DEMOLITION (DM) JOB SIGNOFF N PER 01/21/2003 02/03/2003 X
MICROFILM: INITIAL N PER 01/21/2003 04/14/2003
INSURANCE: WORKERS' COMPENSATION N PER 01/21/2003 04/14/2003
INSURANCE: LIABILITY N PER 01/21/2003 04/14/2003
* STREET OBSTRUCTION BOND N PER 01/21/2003 04/14/2003
INSURANCE: DISABILITY N PER 01/21/2003 04/14/2003
EXCAVATION OR DEMOLITION: 5-DAY NOTICE N PER 02/03/2003 04/14/2003
* * SUBGRADE 27-723,DIRC 15/71 N PER 02/03/2003 02/03/2003 11/09/2006
* UNDERPINNING 27-724 T PER 02/03/2003 02/03/2003 12/08/2006
* WELDING 27-616 N PER 02/03/2003 02/03/2003 11/09/2006
* HIGH STRENGTH BOLTS TABLE 10-2 N PER 02/03/2003 02/03/2003 11/09/2006
* FIRE STOPS 27-345 N PER 02/03/2003 02/03/2003 11/09/2006
* VENT. SYS.-ENGINEER/INSTALLER 27-136,779 N PER 02/03/2003 02/03/2003 11/09/2006
* NOISE CONTROL TESTS 27-768,769,770 N PER 02/03/2003 02/03/2003 11/09/2006
* SPRAY ON FIREPROOF.-NEW INSTALL 27-324(F) N PER 02/03/2003 02/03/2003 11/09/2006
* REINFORCED MASONRY TABLE 10-2 N PER 02/03/2003 02/03/2003 11/09/2006
* MASONRY UNITS RS 10-3 3.2 N PER 02/03/2003 02/03/2003 11/09/2006
* CONCRETE 27-603 N PER 02/03/2003 02/03/2003 11/09/2006
* TR3: CONCRETE DESIGN MIX TECHNICAL REPORT N PER 02/03/2003 02/03/2003 11/09/2006
* TR2: CONCRETE TEST CYLINDERS TECHNICAL REPORT N PER 02/03/2003 02/03/2003 11/09/2006
* CHIMNEYS 27-856 N PER 02/03/2003 04/14/2003 11/09/2006
* HEATING SYSTEM / BOILERS 27-793 N PER 02/03/2003 02/03/2003 11/09/2006
* * VENTILATION / AIR CONDITIONING N PER 02/03/2003 02/03/2003 11/09/2006
* * LT.GAUGE STEEL/WOOD FL.TRUSS/LAM.IBEAM TPPN2/00 N PER 02/03/2003 02/03/2003 11/09/2006
ROOF DETENTION N PER 02/03/2003 02/03/2003 11/09/2006
CERTIFICATE OF OCCUPANCY N SGN 01/21/2003 02/14/2008
SITE SURVEY: FINAL N SGN 01/21/2003 01/15/2008
BPP: FINAL SIGNOFF T SGN 01/21/2003 01/04/2007
* DEMOLITION FILED AND PERMITTED REQUIRED N SGN 01/21/2003 02/03/2003 X
DEMOLITION (DM) JOB SIGNOFF N SGN 01/21/2003 02/03/2003 X
FINAL PLUMBING SIGNOFF N SGN 01/21/2003 11/17/2006
FINAL ELEVATOR SIGNOFF N SGN 01/21/2003 11/13/2006
FINAL ELECTRICAL SIGNOFF N SGN 01/21/2003 10/24/2006
FINAL CONSTRUCTION SIGNOFF N SGN 01/21/2003 12/13/2006
VERIFY TAX LOT N SGN 01/21/2003 11/09/2006 X
CO OBJ: VERIFY ADDRESS-TOPO STAMP N SGN 01/21/2003 11/09/2006
VIOLATIONS SEARCH N SGN 01/21/2003 01/25/2008
OPEN APPLICATIONS SEARCH N SGN 01/21/2003 01/25/2008
FOLDER REVIEW N SGN 01/21/2003 11/09/2006
TAX LOT: FINAL LOT NUMBER ISSUED N SGN 02/03/2003 11/09/2006 X
* HIGHWAY LETTER N SGN 02/03/2003 01/15/2008
MICROFILM: ADDITIONAL REQUIRED N SGN 02/03/2003 11/09/2006
DETECTOR:SMOKE-CERT. OF INSTALLATION N SGN 02/03/2003 02/08/2008
* SPRINKLER TEST(HYDROSTATIC) 27-967 N SGN 02/03/2003 02/03/2003 02/14/2008
DRY PIPE VALVE TEST : FP-10 T SGN 04/25/2006 04/25/2006
SPRINKLER INSP REPORT : FP-85 T SGN 04/25/2006 04/25/2006
* CARBON MONOXIDE AFFIDAVIT N SGN 05/01/2006 05/01/2006
TAP LETTER - DOM SVC : DEP-DOM N SGN 05/02/2006 05/02/2006
TAP LETTER - FIRE SVC : DEP-FIRE N SGN 05/02/2006 05/02/2006
WATER METER PERMIT : DEP-METER N SGN 05/02/2006 05/02/2006
RPZ/DDCV TEST REPORT : GEN215B N SGN 05/02/2006 05/02/2006
BPP CONSTRUCTION SIGNOFF (301477603) N SGN 05/03/2006 12/18/2006
CONSTR.INSP REQ'D PRIOR TO RENEWAL... N SGN 11/09/2006 12/14/2006
...AS PER COMMISSIONER. N SGN 11/09/2006 12/14/2006
OK TO ISSUE TCO #1 FOR 30 DAYS BY M.MOSSAD N SGN 11/09/2006 11/09/2006
FLOORS 1-6 ONLY N SGN 11/09/2006 12/14/2006
OK TO ISSUE TCO FOR 90 DAYS N SGN 12/14/2006 12/14/2006
CO OBJ: OPEN PAA MUST BE RESOLVED N SGN 03/12/2007 07/06/2007
FOLDER REJECTED N SGN 03/12/2007 04/04/2007
OK TO RENEW TCO #3 FOR 90 DAYS N SGN 04/04/2007 04/04/2007
OK TO ISSUE WITH OPEN PAA AS M. MOSSAD N SGN 04/04/2007 04/04/2007
FILE PAA TO CORRECT # OF UNITS IN BISSYSTEM PRIOR TO FINAL. N SGN 07/06/2007 01/25/2008
OK TO RENEW TCO #4 FOR 90 DAYS N SGN 07/06/2007 07/06/2007
OK TO RENEW TCO #5 FOR 90 DAYS N SGN 11/23/2007 11/23/2007
FOLDER REJECTED N SGN 01/15/2008 01/25/2008
UB #930 MUST BE DISMISSED N SGN 01/15/2008 01/25/2008
FILE PAA TO ADD CRFN # TO SCH.A. N SGN 01/15/2008 01/25/2008
FOLDER REJECTED N SGN 01/25/2008 02/08/2008
SEE ABOVE N SGN 01/25/2008 02/08/2008
FOLDER NOT FOUND; CHECK RECORD ROOM N SGN 02/06/2008 02/08/2008
FOLDER REJECTED N SGN 02/08/2008 02/14/2008
INITIAL TR-1 MUST BE SUBMITTED PRIORTO FINAL N SGN 02/08/2008 02/14/2008
(+) N = Can be received by clerical staff; T = Can only be received by a plan examiner
Some items may not be required for your specific work filing.
Enter Criteria for Required Item Display
Display Items Required Prior To: Which Items Should Be Displayed?
Approval All Items
Permit Open Items Only
Signoff   


If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.

BIS Menu  |  Property Profile  |  Items Required  |  Back