| ECB Violation Summary |
VIOLATION RESOLVED |
| ECB Violation Number: 34790525N |
| Violation Severity: CLASS - 1 |
Status: AFFIDAVIT ACCEPTED |
|
| Respondent Information |
|
Name: |
S & P PIPING & CONSTR COR |
|
|
Mailing Address: |
144-19 106 AVENUE , JAMAICA , NY 11435 |
|
License/Registration/Tracking Number: |
GC601160 |
|
| Violation Details |
|
Issue Date: |
06/09/2009 |
|
Violation Type: |
CN - CONSTRUCTION |
|
Served Date: |
06/09/2009 |
|
Issuing Unit: |
BEST SQUAD |
|
|
|
|
|
|
|
|
| Infraction Codes |
Section of Law |
Standard Description |
| 118 |
BC 3301.2,27-1009(A) |
FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OT TEMPORARY CONSTRUCTION - NO TOE BOARDS |
|
|
Specific Violation Condition(s) and Remedy: |
|
FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY CONSTRUCTION - NO TOE BOARDS. NOTED: AT TIME OF INSPECTION AT ABOVE ACTIVE SITE CONSTRUCTION WORK IN PROGRESS. OBSERVED THERE ARE NO TOE |
|
|
Issuing Inspector ID: |
2429 |
DOB Violation Number: 060909CSTLE02 |
|
Issued as Aggravated Level: |
NO |
|
|
| Hearing Information |
|
Scheduled Hearing Date: |
02/22/2010 |
|
Hearing Status: |
DEFAULT |
|
Hearing Time: |
9:00 |
|
|
| Penalty and Compliance Information |
|
Penalty Imposed: |
$5,000.00 |
|
Compliance/Certification Status: |
AFFIDAVIT ACCEPTED |
|
Adjustments: |
$0.00 |
|
|
|
Amount Paid: |
$0.00 |
|
|
|
Balance Due: |
$5,000.00 |
|
|
|
Court Docket Date: |
00/00/0000 |
|
|
| A Certificate of Correction must be submitted to the Administrative Enforcement Unit (AEU)
for all violations. A violation that is not dismissed by ECB will continue to remain ACTIVE or "open" on DOB records
until acceptable proof is submitted to the AEU, even if you have paid the penalty imposed by ECB. |
|