| NYC Department of Buildings | ||
| B-SCAN List of Required Items | ||
| Premises: | Job No: 301655509 |
| BIN: Block: 0 Lot: 0 | Job Type: NB - NEW BUILDING |
| 99 TOTAL ITEMS REQUIRED FOR JOB |
WHO RECV+ |
PRI TO |
REQUIRED DATE |
RECEIVED DATE |
DATE CERTIFIED |
WAIVED | |
| SEWER CONNECTION: DEP SD1 & SD2 | T | APP | 10/29/2003 | 03/25/2004 | |||
| * PC FILED APP/OWNER SIGNED AND SEALED | T | APP | 10/29/2003 | 03/25/2004 | |||
| BPP: FILING REQUIRED | T | APP | 10/29/2003 | 03/25/2004 | |||
| TRANSIT AUTHORITY APPROVAL | T | APP | 11/12/2003 | 03/25/2004 | |||
| ENVIRONMENTAL "E" DEP NOTICE TO PROCEED | T | APP | 11/12/2003 | 03/25/2004 | |||
| SITE SURVEY: INITIAL | N | APP | 11/12/2003 | 03/25/2004 | |||
| * * BORINGS / TEST PITS (TR-4) 27-720 | N | APP | 11/12/2003 | 03/25/2004 | 03/25/2004 | ||
| ADDRESS: NEW HOUSE NUMBER APPROVED | T | APP | 12/15/2003 | 03/25/2004 | |||
| TAX LOT: TENTATIVE LOT NUMBER ISSUED | T | APP | 12/15/2003 | 03/25/2004 | |||
| STREET: NEW STREET NAME APPROVED | T | APP | 12/15/2003 | 03/25/2004 | |||
| FOUNDATION PLAN APPROVAL | N | APP | 12/15/2003 | 03/25/2004 | |||
| MICROFILM APPROVED PLANS FOR DOC #08 | T | APP | 05/20/2008 | 05/20/2008 | |||
| MICROFILM APPROVED PLANS FOR DOC #10 | T | APP | 02/25/2009 | 02/25/2009 | |||
| * DEMOLITION (DM) JOB SIGNOFF | N | PER | 10/29/2003 | 03/26/2004 | X | ||
| MICROFILM: INITIAL | N | PER | 10/29/2003 | 07/08/2004 | |||
| INSURANCE: WORKERS' COMPENSATION | N | PER | 10/29/2003 | 05/19/2004 | |||
| INSURANCE: LIABILITY | N | PER | 10/29/2003 | 05/19/2004 | |||
| * STREET OBSTRUCTION BOND | N | PER | 10/29/2003 | 05/19/2004 | |||
| INSURANCE: DISABILITY | N | PER | 10/29/2003 | 05/19/2004 | |||
| EXCAVATION OR DEMOLITION: 5-DAY NOTICE | N | PER | 11/12/2003 | 05/19/2004 | |||
| * * SUBGRADE 27-723,DIRC 15/71 | N | PER | 11/12/2003 | 07/08/2004 | 06/27/2008 | ||
| * UNDERPINNING 27-724 | T | PER | 11/12/2003 | 03/25/2004 | ________ | ||
| * FIRE STOPS 27-345 | N | PER | 11/12/2003 | 07/08/2004 | 06/27/2008 | ||
| * VENT. SYS.-ENGINEER/INSTALLER 27-136,779 | N | PER | 11/12/2003 | 07/08/2004 | 06/27/2008 | ||
| * REINFORCED MASONRY TABLE 10-2 | N | PER | 11/12/2003 | 07/08/2004 | 06/27/2008 | ||
| * MASONRY UNITS RS 10-3 3.2 | N | PER | 11/12/2003 | 07/08/2004 | 06/27/2008 | ||
| * TR2: CONCRETE TEST CYLINDERS TECHNICAL REPORT | N | PER | 11/12/2003 | 07/08/2004 | 06/27/2008 | ||
| * * LT.GAUGE STEEL/WOOD FL.TRUSS/LAM.IBEAM TPPN2/00 | N | PER | 11/12/2003 | 07/08/2004 | 06/27/2008 | ||
| SIDEWALK SHED APPLICATION & PERMIT | N | PER | 12/15/2003 | 07/08/2004 | |||
| * WELDING 27-616 | N | PER | 12/15/2003 | 07/08/2004 | 06/27/2008 | ||
| * HIGH STRENGTH BOLTS TABLE 10-2 | N | PER | 12/15/2003 | 07/08/2004 | 06/27/2008 | ||
| * SPRAY ON FIREPROOF.-NEW INSTALL 27-324(F) | N | PER | 12/15/2003 | 07/08/2004 | 06/27/2008 | ||
| * CONCRETE 27-603 | N | PER | 12/15/2003 | 07/08/2004 | 06/27/2008 | ||
| * TR3: CONCRETE DESIGN MIX TECHNICAL REPORT | N | PER | 12/15/2003 | 07/08/2004 | 06/27/2008 | ||
| * CHIMNEYS 27-856 | N | PER | 12/15/2003 | 07/08/2004 | 06/27/2008 | ||
| CERTIFICATE OF OCCUPANCY | N | SGN | 10/29/2003 | ________ | |||
| SITE SURVEY: FINAL | N | SGN | 10/29/2003 | ________ | |||
| BPP: FINAL SIGNOFF | N | SGN | 10/29/2003 | ________ | |||
| * DEMOLITION FILED AND PERMITTED REQUIRED | N | SGN | 10/29/2003 | 03/26/2004 | X | ||
| DEMOLITION (DM) JOB SIGNOFF | N | SGN | 10/29/2003 | 03/26/2004 | X | ||
| FINAL PLUMBING SIGNOFF | N | SGN | 10/29/2003 | ________ | |||
| FINAL ELEVATOR SIGNOFF | N | SGN | 10/29/2003 | 12/09/2008 | |||
| FINAL ELECTRICAL SIGNOFF | N | SGN | 10/29/2003 | ________ | |||
| FINAL CONSTRUCTION SIGNOFF | N | SGN | 10/29/2003 | ________ | |||
| VERIFY TAX LOT | N | SGN | 10/29/2003 | 07/21/2008 | |||
| CO OBJ: VERIFY ADDRESS-TOPO STAMP | N | SGN | 10/29/2003 | 06/27/2008 | |||
| VIOLATIONS SEARCH | N | SGN | 10/29/2003 | ________ | |||
| OPEN APPLICATIONS SEARCH | N | SGN | 10/29/2003 | ________ | |||
| FOLDER REVIEW | N | SGN | 10/29/2003 | 06/26/2008 | |||
| ADDRESS: NEW HOUSE NUMBER APPROVED | N | SGN | 11/12/2003 | 06/27/2008 | |||
| TAX LOT: FINAL LOT NUMBER ISSUED | N | SGN | 11/12/2003 | 07/21/2008 | |||
| STREET: NEW NAME APPROVED | N | SGN | 11/12/2003 | 07/21/2008 | |||
| BPP-PARKS: PLANT NEW TREE | T | SGN | 11/12/2003 | ________ | |||
| BPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS | T | SGN | 11/12/2003 | ________ | |||
| ENVIRONMENTAL "E" DEP NOTICE OF SATIS | N | SGN | 11/12/2003 | ________ | |||
| SPRINKLER (SP) SIGNOFF | N | SGN | 11/12/2003 | ________ | |||
| STANDPIPE (SD) SIGNOFF | N | SGN | 11/12/2003 | ________ | |||
| ELEVATOR JOB SIGNOFF | N | SGN | 11/12/2003 | ________ | |||
| CURB CUT (CC) SIGNOFF | N | SGN | 11/12/2003 | ________ | |||
| DETECTOR:SMOKE-CERT. OF INSTALLATION | N | SGN | 11/12/2003 | 10/20/2008 | |||
| MH WORKTYPE FOR HVAC SYSTEM. | T | SGN | 11/12/2003 | ________ | |||
| MECHANICAL (MH) SIGNOFF | N | SGN | 12/15/2003 | ________ | |||
| SEWER/HOUSE CON SIGNOFF: DEP HC 021 | N | SGN | 08/24/2006 | 08/24/2006 | |||
| TEMP CONST. SIGNOFF | N | SGN | 01/02/2008 | 01/02/2008 | |||
| WATER METER PERMIT : DEP-METER | N | SGN | 02/20/2008 | 02/20/2008 | |||
| RPZ/DDCV TEST REPORT : GEN215B | N | SGN | 02/20/2008 | 02/20/2008 | |||
| BOILER APPROVAL : 900A | T | SGN | 02/20/2008 | 02/20/2008 | |||
| TAP LETTER - FIRE SVC : DEP-FIRE | N | SGN | 03/20/2008 | 03/20/2008 | |||
| TEMP CONSTRUCTION SIGNOFF (2) | N | SGN | 06/13/2008 | 06/13/2008 | |||
| TAP LETTER - DOM SVC : DEP-DOM | N | SGN | 06/24/2008 | 06/24/2008 | |||
| TEMP PL SIGNOFF - ENTIRE BUILDING | N | SGN | 06/24/2008 | 06/24/2008 | |||
| TEMP (PL) FOR FLOORS CELLAR TO 12 FOR30 DAYS | N | SGN | 06/24/2008 | 06/24/2008 | |||
| FOLDER REJECTED | N | SGN | 06/26/2008 | 06/27/2008 | |||
| FINAL TR-1 MUST BE SUBMITTED PRIOR TOTCO. | N | SGN | 06/26/2008 | 06/27/2008 | |||
| JOB ON HOLD | N | SGN | 06/26/2008 | 06/27/2008 | |||
| OK TO ISSUE TCO #1 FOR 30 DAYS | N | SGN | 06/27/2008 | 06/27/2008 | |||
| PROV.NEW COMM.APPROVAL PRIOR-RENEWAL | N | SGN | 07/21/2008 | 07/24/2008 | |||
| OK TO RENEW TCO #2 FOR 90 DAYS | N | SGN | 07/25/2008 | 07/25/2008 | |||
| PRIOR-FINAL PR APPL.#300365272 MUST BE WITHDRAWN OR SIGNED-OFF | N | SGN | 10/20/2008 | 01/26/2009 | |||
| OK TO RENEW (90) DAY TCO #3 | N | SGN | 10/20/2008 | 10/20/2008 | |||
| ONE (1) MORE RENEWAL ALLOWED OFF M. MOSSAD (90) DAY APPROVAL ON 7/25/08 | N | SGN | 10/20/2008 | 01/14/2009 | |||
| OK TO RENEW TCO #4 FOR 90 DAYS | N | SGN | 01/14/2009 | 01/14/2009 | |||
| ELECTRICAL OBJ: OPEN APPLICATIONS | N | SGN | 01/23/2009 | ________ | |||
| FOLDER REJECTED | N | SGN | 04/15/2009 | 04/28/2009 | |||
| TEMP CONSTRUCTION SIGNOFF ALL FLOORS | N | SGN | 04/17/2009 | 04/17/2009 | |||
| PROVIDE NEW COMM. APPROVAL- (3) TCO'S ISSUED ON LATEST APPROVAL 07/25/08 | N | SGN | 04/22/2009 | 04/28/2009 | |||
| FOLDER REJECTED | N | SGN | 04/28/2009 | 04/28/2009 | |||
| CONST. INSPECTION HAS OPEN WORKORDER | N | SGN | 04/28/2009 | 04/28/2009 | |||
| OK TO RENEW TCO #5 FOR 60 DAYS | N | SGN | 04/28/2009 | 04/28/2009 | |||
| PROVIDE NEW COMMISSIONER APPROVAL | N | SGN | 06/22/2009 | 06/23/2009 | |||
| OK TO RENEW (30) DAY TCO #6, AS PER J. GALLAGHER ON 06/19/09 | N | SGN | 06/23/2009 | 06/23/2009 | |||
| OK TO RENEW TCO FOR (15) DAYS, #7, AS PER J.GALLAGHER ON 07/23/09 | N | SGN | 07/24/2009 | 07/24/2009 | |||
| OK TO RENEW TCO FOR (30) DAY #8,AS PER J.GALLAGHER ON 07/30/09 | N | SGN | 08/06/2009 | 08/06/2009 | |||
| OK TO RENEW TCO FOR (30) DAYS #9, AS PER J.GALLAGHER ON 09/03/09 | N | SGN | 09/09/2009 | 09/09/2009 | |||
| AS PER J.GALLAGHER ON 09/03/09 NOT TO BE RENEWED | N | SGN | 09/09/2009 | 10/13/2009 | |||
| * TR2 PRIOR TO SIGNOFF | N | SGN | 10/01/2009 | ________ | ________ | ||
| * TR3 PRIOR TO SIGNOFF | N | SGN | 10/02/2009 | ________ | |||
| OK TO RENEW TCO FOR (30) DAYS #10, AS PER J.GALLAGHER ON 10/13/09 | N | SGN | 10/15/2009 | 10/15/2009 | |||
| AS PER J.GALLAGHER ON 10/13/09 'NO TCO RENEWAL'W/OUT SIGN-OFF OF OPEN APPLS. | N | SGN | 10/15/2009 | ________ | |||