BIN:     Block: 0    Lot: 0 Job Type: NB - NEW BUILDING
99 TOTAL ITEMS REQUIRED FOR JOB
WHO
RECV+
PRI
TO
REQUIRED
DATE
RECEIVED
DATE
DATE
CERTIFIED
WAIVED
SEWER CONNECTION: DEP SD1 & SD2 T APP 10/29/2003 03/25/2004
* PC FILED APP/OWNER SIGNED AND SEALED T APP 10/29/2003 03/25/2004
BPP: FILING REQUIRED T APP 10/29/2003 03/25/2004
TRANSIT AUTHORITY APPROVAL T APP 11/12/2003 03/25/2004
ENVIRONMENTAL "E" DEP NOTICE TO PROCEED T APP 11/12/2003 03/25/2004
SITE SURVEY: INITIAL N APP 11/12/2003 03/25/2004
* * BORINGS / TEST PITS (TR-4) 27-720 N APP 11/12/2003 03/25/2004 03/25/2004
ADDRESS: NEW HOUSE NUMBER APPROVED T APP 12/15/2003 03/25/2004
TAX LOT: TENTATIVE LOT NUMBER ISSUED T APP 12/15/2003 03/25/2004
STREET: NEW STREET NAME APPROVED T APP 12/15/2003 03/25/2004
FOUNDATION PLAN APPROVAL N APP 12/15/2003 03/25/2004
MICROFILM APPROVED PLANS FOR DOC #08 T APP 05/20/2008 05/20/2008
MICROFILM APPROVED PLANS FOR DOC #10 T APP 02/25/2009 02/25/2009
* DEMOLITION (DM) JOB SIGNOFF N PER 10/29/2003 03/26/2004 X
MICROFILM: INITIAL N PER 10/29/2003 07/08/2004
INSURANCE: WORKERS' COMPENSATION N PER 10/29/2003 05/19/2004
INSURANCE: LIABILITY N PER 10/29/2003 05/19/2004
* STREET OBSTRUCTION BOND N PER 10/29/2003 05/19/2004
INSURANCE: DISABILITY N PER 10/29/2003 05/19/2004
EXCAVATION OR DEMOLITION: 5-DAY NOTICE N PER 11/12/2003 05/19/2004
* * SUBGRADE 27-723,DIRC 15/71 N PER 11/12/2003 07/08/2004 06/27/2008
* UNDERPINNING 27-724 T PER 11/12/2003 03/25/2004 ________
* FIRE STOPS 27-345 N PER 11/12/2003 07/08/2004 06/27/2008
* VENT. SYS.-ENGINEER/INSTALLER 27-136,779 N PER 11/12/2003 07/08/2004 06/27/2008
* REINFORCED MASONRY TABLE 10-2 N PER 11/12/2003 07/08/2004 06/27/2008
* MASONRY UNITS RS 10-3 3.2 N PER 11/12/2003 07/08/2004 06/27/2008
* TR2: CONCRETE TEST CYLINDERS TECHNICAL REPORT N PER 11/12/2003 07/08/2004 06/27/2008
* * LT.GAUGE STEEL/WOOD FL.TRUSS/LAM.IBEAM TPPN2/00 N PER 11/12/2003 07/08/2004 06/27/2008
SIDEWALK SHED APPLICATION & PERMIT N PER 12/15/2003 07/08/2004
* WELDING 27-616 N PER 12/15/2003 07/08/2004 06/27/2008
* HIGH STRENGTH BOLTS TABLE 10-2 N PER 12/15/2003 07/08/2004 06/27/2008
* SPRAY ON FIREPROOF.-NEW INSTALL 27-324(F) N PER 12/15/2003 07/08/2004 06/27/2008
* CONCRETE 27-603 N PER 12/15/2003 07/08/2004 06/27/2008
* TR3: CONCRETE DESIGN MIX TECHNICAL REPORT N PER 12/15/2003 07/08/2004 06/27/2008
* CHIMNEYS 27-856 N PER 12/15/2003 07/08/2004 06/27/2008
CERTIFICATE OF OCCUPANCY N SGN 10/29/2003 ________
SITE SURVEY: FINAL N SGN 10/29/2003 ________
BPP: FINAL SIGNOFF N SGN 10/29/2003 ________
* DEMOLITION FILED AND PERMITTED REQUIRED N SGN 10/29/2003 03/26/2004 X
DEMOLITION (DM) JOB SIGNOFF N SGN 10/29/2003 03/26/2004 X
FINAL PLUMBING SIGNOFF N SGN 10/29/2003 ________
FINAL ELEVATOR SIGNOFF N SGN 10/29/2003 12/09/2008
FINAL ELECTRICAL SIGNOFF N SGN 10/29/2003 ________
FINAL CONSTRUCTION SIGNOFF N SGN 10/29/2003 ________
VERIFY TAX LOT N SGN 10/29/2003 07/21/2008
CO OBJ: VERIFY ADDRESS-TOPO STAMP N SGN 10/29/2003 06/27/2008
VIOLATIONS SEARCH N SGN 10/29/2003 ________
OPEN APPLICATIONS SEARCH N SGN 10/29/2003 ________
FOLDER REVIEW N SGN 10/29/2003 06/26/2008
ADDRESS: NEW HOUSE NUMBER APPROVED N SGN 11/12/2003 06/27/2008
TAX LOT: FINAL LOT NUMBER ISSUED N SGN 11/12/2003 07/21/2008
STREET: NEW NAME APPROVED N SGN 11/12/2003 07/21/2008
BPP-PARKS: PLANT NEW TREE T SGN 11/12/2003 ________
BPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS T SGN 11/12/2003 ________
ENVIRONMENTAL "E" DEP NOTICE OF SATIS N SGN 11/12/2003 ________
SPRINKLER (SP) SIGNOFF N SGN 11/12/2003 ________
STANDPIPE (SD) SIGNOFF N SGN 11/12/2003 ________
ELEVATOR JOB SIGNOFF N SGN 11/12/2003 ________
CURB CUT (CC) SIGNOFF N SGN 11/12/2003 ________
DETECTOR:SMOKE-CERT. OF INSTALLATION N SGN 11/12/2003 10/20/2008
MH WORKTYPE FOR HVAC SYSTEM. T SGN 11/12/2003 ________
MECHANICAL (MH) SIGNOFF N SGN 12/15/2003 ________
SEWER/HOUSE CON SIGNOFF: DEP HC 021 N SGN 08/24/2006 08/24/2006
TEMP CONST. SIGNOFF N SGN 01/02/2008 01/02/2008
WATER METER PERMIT : DEP-METER N SGN 02/20/2008 02/20/2008
RPZ/DDCV TEST REPORT : GEN215B N SGN 02/20/2008 02/20/2008
BOILER APPROVAL : 900A T SGN 02/20/2008 02/20/2008
TAP LETTER - FIRE SVC : DEP-FIRE N SGN 03/20/2008 03/20/2008
TEMP CONSTRUCTION SIGNOFF (2) N SGN 06/13/2008 06/13/2008
TAP LETTER - DOM SVC : DEP-DOM N SGN 06/24/2008 06/24/2008
TEMP PL SIGNOFF - ENTIRE BUILDING N SGN 06/24/2008 06/24/2008
TEMP (PL) FOR FLOORS CELLAR TO 12 FOR30 DAYS N SGN 06/24/2008 06/24/2008
FOLDER REJECTED N SGN 06/26/2008 06/27/2008
FINAL TR-1 MUST BE SUBMITTED PRIOR TOTCO. N SGN 06/26/2008 06/27/2008
JOB ON HOLD N SGN 06/26/2008 06/27/2008
OK TO ISSUE TCO #1 FOR 30 DAYS N SGN 06/27/2008 06/27/2008
PROV.NEW COMM.APPROVAL PRIOR-RENEWAL N SGN 07/21/2008 07/24/2008
OK TO RENEW TCO #2 FOR 90 DAYS N SGN 07/25/2008 07/25/2008
PRIOR-FINAL PR APPL.#300365272 MUST BE WITHDRAWN OR SIGNED-OFF N SGN 10/20/2008 01/26/2009
OK TO RENEW (90) DAY TCO #3 N SGN 10/20/2008 10/20/2008
ONE (1) MORE RENEWAL ALLOWED OFF M. MOSSAD (90) DAY APPROVAL ON 7/25/08 N SGN 10/20/2008 01/14/2009
OK TO RENEW TCO #4 FOR 90 DAYS N SGN 01/14/2009 01/14/2009
ELECTRICAL OBJ: OPEN APPLICATIONS N SGN 01/23/2009 ________
FOLDER REJECTED N SGN 04/15/2009 04/28/2009
TEMP CONSTRUCTION SIGNOFF ALL FLOORS N SGN 04/17/2009 04/17/2009
PROVIDE NEW COMM. APPROVAL- (3) TCO'S ISSUED ON LATEST APPROVAL 07/25/08 N SGN 04/22/2009 04/28/2009
FOLDER REJECTED N SGN 04/28/2009 04/28/2009
CONST. INSPECTION HAS OPEN WORKORDER N SGN 04/28/2009 04/28/2009
OK TO RENEW TCO #5 FOR 60 DAYS N SGN 04/28/2009 04/28/2009
PROVIDE NEW COMMISSIONER APPROVAL N SGN 06/22/2009 06/23/2009
OK TO RENEW (30) DAY TCO #6, AS PER J. GALLAGHER ON 06/19/09 N SGN 06/23/2009 06/23/2009
OK TO RENEW TCO FOR (15) DAYS, #7, AS PER J.GALLAGHER ON 07/23/09 N SGN 07/24/2009 07/24/2009
OK TO RENEW TCO FOR (30) DAY #8,AS PER J.GALLAGHER ON 07/30/09 N SGN 08/06/2009 08/06/2009
OK TO RENEW TCO FOR (30) DAYS #9, AS PER J.GALLAGHER ON 09/03/09 N SGN 09/09/2009 09/09/2009
AS PER J.GALLAGHER ON 09/03/09 NOT TO BE RENEWED N SGN 09/09/2009 10/13/2009
* TR2 PRIOR TO SIGNOFF N SGN 10/01/2009 ________ ________
* TR3 PRIOR TO SIGNOFF N SGN 10/02/2009 ________
OK TO RENEW TCO FOR (30) DAYS #10, AS PER J.GALLAGHER ON 10/13/09 N SGN 10/15/2009 10/15/2009
AS PER J.GALLAGHER ON 10/13/09 'NO TCO RENEWAL'W/OUT SIGN-OFF OF OPEN APPLS. N SGN 10/15/2009 ________
(+) N = Can be received by clerical staff; T = Can only be received by a plan examiner
Some items may not be required for your specific work filing.
Enter Criteria for Required Item Display
Display Items Required Prior To: Which Items Should Be Displayed?
Approval All Items
Permit Open Items Only
Signoff   


If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.

BIS Menu  |  Property Profile  |  Items Required  |  Back